Tell us About You: |
* Name: |
|
* Company Name:
("None" if N/A) |
|
Title: |
|
Address: |
|
|
|
City: |
|
State/Province (if applicable): |
|
Zip or Postal Code: |
|
* Country: |
|
Phone: |
|
Fax: |
|
* E-mail Address: |
|
|
|
Enter Your Industry: |
|
* How Did You Learn of Our Company? |
|
(If magazine or internet search engine, please specify which.) |
|
|
|
| Tell us about the water treatment system you would like us to quote for you: |
| Product Water Requirements |
* What is the volume of product water required per day? |
(specify unit of measure) |
What is the volume of product water required per hour? |
(specify unit of measure) |
If possible, project future water requirements 1-3 years from now: |
|
How many hours per day is product required? |
|
How many days per week? |
|
What are the product water quality (level of purity) requirements? Please describe in as much detail as possible. If the water quality needs to meet a specific standard, please include that information here.
|
|
|
| What is the maximum number of days the RO System will not be in operation? |
|
|
|
| Instrumentation |
Are there any special control or instrumentation requirements? |
|
Does this application require digital outputs for data transmission to a remote computer or monitor? |
|
|
|
| Feed to Proposed treatment Facility: |
* What is the water source? (Municipal, well, surface, other) |
|
Expected Feed Water temperature:
Temperature range accuracy is important to minimize equipment cost. |
Average: |
Fahrenheit (F)
Celsius (C) |
| Lowest: |
Fahrenheit (F)
Celsius (C) |
| Highest: |
Fahrenheit (F)
Celsius (C) |
Is low cost energy available to increase the lowest temperature? |
|
Expected feed water pressure: |
Lowest at full flow:
Highest at zero flow:
|
Has this feed supply been checked for possible low pressure problems due to shared use of supply line?
Yes
No |
* Feed Analysis (copy and paste) if not available, feed TDS or Conductivity
|
| Site Conditions |
How much space is available for this system? |
|
What is the maximum door size opening? |
Width
Height |
What is the available electrical power? |
Volts
Phases
Hertz
Amps |
What is the electrical cost per KWH? |
(specify currency) |
What is the cost of the water to be treated? |
(specify unit of measure) |
What environment will the system be located in? |
|
What are the atmospheric conditions to which the system will be exposed? (eg: corrosive, damp, dusty, hazardous explosive fumes, extreme heat, etc.). Please Describe:
|
|
|
What is the range of the ambient air temperature variations? |
Fahrenheit (F)
Celsius (C) |
What is the approximate date that this system is required to be in operation? |
|
Are there storage facilities for the product water? (please describe) |
|
How many hours per day is the facility staffed? |
|
Is this a constant or intermittent duty application? |
|
What is the anticipated product water PSI requirement? |
|
* Please describe overall application or any additional requirements not covered.
|
|
|